Prepare the inputs
Start with a representative set of orders and agree on operations, resources, and the planning horizon. Inputs can include company-provided ERP exports, spreadsheets, authorized SQL query results, current schedules, and operating rules.
- Order quantities, due dates, and business priorities.
- Routings, operation sequences, eligible machines, and processing times.
- Resource calendars, shifts, available capacity, and confirmed downtime.
- Material status, BOMs, and confirmed availability conditions within scope.
- Current schedules, work-in-progress, and exceptions that require human review.
Confirm the rules before comparing plans
Check field meanings, data timestamps, time units, and routing rules with the planning team. Agree on which conditions are represented in this round and which still need shop-floor verification.
Kavop generates schedule candidates from the confirmed orders, routings, machines, materials, shifts, and due dates. It explains late orders, bottlenecks, and rush-order impact within that scope. Planners review the results against shop-floor conditions.
Keep system ownership and approval records
The first round stays read-only. It does not write business data into ERP, SAP, or MES, or automatically dispatch production instructions. Existing systems remain the systems of record.
Planners compare, adjust, and approve candidates. Plan versions and approval records stay in the same workflow. Exported results are handed over through the company's established process.
Agree on deployment and interfaces per project
Paid discovery defines the operating environment, network access, account permissions, data retention, support responsibilities, and acceptance criteria. The agreed solution and contract determine the deployment scope.
Real-time synchronization, bidirectional write-back, automatic dispatch, and unified multi-plant scheduling require separate validation of interfaces, permissions, and product suitability. They are not commitments included in the first read-only round.
Check results against specific orders
Evaluate operation sequences, resource allocation, material conditions, and expected completion dates for the agreed orders, then compare the candidates with the current plan.
Where current capacity cannot meet demand, identify the limiting resources and delivery dates that need coordination. The company decides whether overtime, outsourcing, or additional resources should enter the next calculation.