Move every orderfrom promise to delivery.
See which orders may slip, where capacity is constrained, and what a rush order would affect.
Kavop surfaces the risks and candidate schedules. Your planner decides what to change.
Book a demo
Order coordination
Capacity scheduling
Ocean shipment
Order coordinationLong-term direction
Capacity schedulingCurrent validation focus
Ocean shipmentLong-term directionA long-term path across coordination, scheduling, and shipment
Kavop currently focuses on capacity scheduling and order due-date analysis. Order coordination and ocean shipment remain long-term directions for further validation.
See how the order-to-delivery flow works
Order coordination
Order records aligned · Due-date interpretation

Capacity scheduling
Finite-capacity scheduling · Candidate comparison

Ocean shipment
Shipment-plan review · Booking and cut-off alignment
- One order threadRequests, schedule candidates, verified shop-floor facts, and shipment milestones retain separate states
- Constraint-ledReview capacity, materials, and due dates within the current data scope
- Human confirmationA planner or authorized owner reviews each candidate
Recalculate a candidate when constraints change
When orders, machines, materials, or actual progress change, update the current inputs and generate comparable candidates. Planners review the impact and missing conditions before deciding what moves forward.
Every candidate version retains its data cutoff, assumptions, and human decisionOrders and constraints
Order records and versions
Constraints and rules organized
AI plan
Candidates within represented constraints
Options planners can compare
Shop-floor facts
The manufacturer decides whether to release through its existing process
Verified execution progress can inform the next review

Next-round input
Verified progress and exceptions
Recheck after the data changes
Orders and constraints

- Rush orders
- Machine status
AI plan
- Due dates
- Capacity
- Materials
Recalculate from updated inputs
Shop-floor facts

Verified actual completion
Next-round input
Verified progress and exceptions
APS candidate scheduling under finite capacity
Review confirmed due dates, routings, machine capacity, and material states in one calculation. Surface conflicts and give planners candidates they can adjust and review before the manufacturer decides any later handoff.
Due-date-priority candidate
The candidate moves near-due orders forward and marks one material constraint and one outsourcing risk.
Swipe sideways to see the full schedule and candidate due-date assessments →
- Line A, Welding. Order A from 5/20 to 5/21; A-02 from 5/22 to 5/22; Pending from 5/26 to 5/27. Illustrative load range 10 to 62. No additional constraint marker. Candidate assessment Order A, Candidate early.
- Line B, Machining. Order C from 5/21 to 5/23; C-02 from 5/24 to 5/25; Changeover from 5/27 to 5/28. Illustrative load range 8 to 72. Constraint markers Line B, May 25, critical material constraint. Candidate assessment Order C, Candidate on time.
- Line C, Assembly. Material prep from 5/20 to 5/21; Order B from 5/23 to 5/25; B-02 from 5/26 to 5/28. Illustrative load range 8 to 70. No additional constraint marker. Candidate assessment Order B, Candidate on time.
- Partner D, Surface finishing. Outsource from 5/21 to 5/22; Order D from 5/25 to 5/27. Illustrative load range 6 to 64. Constraint markers Partner D, May 27, delivery risk. Candidate assessment Order D, Partner risk.
Planner-led review for every schedule candidate
The system proposes a candidate and surfaces risk. The planner reviews priorities and key constraints, then the manufacturer's authorized owner decides whether to adopt, hand off, or revise it. Planners still verify unmodelled shop-floor conditions. Material review uses only the confirmed material status available within the current scope.
- 01
Candidate
Generate a candidate from represented constraints and flag risk
Illustrative schedule candidate / Order set 0520Candidate moves Order A17 forward and preserves the partner windowDelivery priorityLine AWeldingLine BMachiningLine CAssemblyPartner DSurface finishingOrder D12 may miss its due date if the partner return slipsReview - 02
Review
The planner adjusts priorities and strategy, then checks unmodelled conditions
Planner workspaceAdjust strategy and review key constraints- Order due dates and customer priority
- Finite capacity on critical machines
- Confirmed material status and partner windows in scope
- 03
Decide
An authorized owner decides whether to adopt, hand off, or revise it
Schedule resultChoose a strategy to view the scheduleWork orderResourceStatusOrder A17Line APending reviewOrder C08Line BPending reviewOrder D12Partner DRisk to reviewAfter inputs are updated and reviewed, rush orders, shortages, or equipment exceptions can enter the next candidate calculation
Data preparation, rules, scheduling calculation, option comparison, and risk explanation
The first round stays read-only and can use company-provided ERP exports, spreadsheets, SQL results, and the current schedule without requiring system replacement first.
- ERP exportsOrders, materials, BOMs, routings, inventory, and purchasing records
- ExcelOrder lists, capacity data, parameters, and custom rules
- SQLAuthorized query results supplied for the agreed review scope
Check the constraints before judging fit
Current validation concentrates on printing, packaging, high-mix low-volume, and adjacent discrete manufacturing. Process manufacturing and complex assembly need separate review against real routings, resources, and material rules.
Assess high-mix, low-volume scheduling fit
01Printing, packaging, and adjacent discrete work
Current bounded samples
Continue validation around high mix, low volume, multiple operations, shared resources, and due-date pressure.
02Process manufacturing
Real sample required
Continuous capacity, batches, and material coupling need separate validation against the manufacturer's actual process.
03Complex assembly
Real sample required
Multi-level structures, critical parts, and long-cycle constraints need separate validation against real BOMs and routings.
See the risk. Decide what to change.
We’ll prepare the demo around your role and the scheduling questions you care about.
Book a demo