AI APSfor manufacturers.

Production plans built for finite capacity. Schedule orders against routing, machines, shifts, and materials, with planners reviewing and confirming each plan.

Book a demo
Order review, capacity scheduling, shipment coordination
Order reviewCapacity schedulingShipment coordination
Order review, capacity scheduling, shipment coordination
Order reviewDue-date commitment
Capacity schedulingFinite-capacity scheduling
Shipment coordinationShipping cadence

When demand exceeds capacity,work through the plan first

Use the same order, capacity, and material inputs to review due dates, resource load, and readiness. Planners decide the production sequence. Diagram data is illustrative.

Explore APS scheduling
  • 01

    Order demand

    Bring together this run’s orders, quantities, and due dates as scheduling inputs.

  • 02

    Due-date review

    Compare requested dates with projected completion and identify dates to coordinate.

  • 03

    Capacity load

    Review resource calendars and available hours to identify bottlenecks.

  • 04

    Production scheduling

    Generate a plan from routings, resource constraints, and priorities for planner review.

AI-assisted · Planner review

Compare the delivery impact before changing the plan.

When a rush order arrives or production conditions change, recalculate with the updated inputs. Compare the original plan and candidates, check which orders move, and decide which version to adopt.

Every plan version records the data it used and who approved it

Orders and changes

Orders and versions
Scheduling rules

AI re-plan

A plan built on real capacity
Several options to compare

Rush orderMachine statusActual completion

Shop-floor completion

Released through the plant's existing process
Checked progress feeds the next round

Next round

Checked progress and exceptions
Rechecked when the data updates

  1. Orders and changes

    • Rush orders
    • Machine status
  2. AI re-plan

    • Due dates
    • Capacity
    • Materials

    Recalculated from the latest data

  3. Shop-floor completion

    Completions checked on the floor

  4. Next round

    Checked progress and exceptions

Next planUpdated from actual shop-floor progress

Turn order priorities into a production plan.

Compare candidates within capacity and material constraints. See how each option affects due dates and resource load, then let planners decide the sequence and which delivery dates need coordination.

APS schedule example: work orders, capacity load, risks, and due-date status
Schedule example · Order set 0520

Due-date priority plan

Orders due soonest go first. One material risk and one outsourcing risk are flagged.

Work orderCapacity loadMaterial constraintRisk alert

Swipe sideways to see the full schedule and due-date status →

  • Line A, Welding. Order A from 5/20 to 5/21; A-02 from 5/22 to 5/22; Pending from 5/26 to 5/27. Load range 10 to 62. No other risk markers. Due-date status Order A, Ahead of date.
  • Line B, Machining. Order C from 5/21 to 5/23; C-02 from 5/24 to 5/25; Changeover from 5/27 to 5/28. Load range 8 to 72. Risk markers Line B, May 25, critical material may arrive late. Due-date status Order C, On time.
  • Line C, Assembly. Material prep from 5/20 to 5/21; Order B from 5/23 to 5/25; B-02 from 5/26 to 5/28. Load range 8 to 70. No other risk markers. Due-date status Order B, On time.
  • Partner D, Surface finishing. Outsource from 5/21 to 5/22; Order D from 5/25 to 5/27. Load range 6 to 64. Risk markers Partner D, May 27, delivery risk. Due-date status Order D, Partner risk.
Line / date
5/205/215/225/235/245/255/265/275/285/295/30
Due-date status
Line AWelding
Order AA-02Pending
Order AAhead of date
Line BMachining
Order CC-02Changeover
Order COn time
Line CAssembly
Material prepOrder BB-02
Order BOn time
Partner DSurface finishing
OutsourceOrder D
Order DPartner risk
Check due datesCompare requested dates with expected completion
Inspect resource loadSee which resources constrain the schedule
Compare plansUnderstand how a priority change affects other orders
Plan comparison and approval

Compare the delivery impact before changing the plan.

When a rush order arrives or production conditions change, recalculate with the updated inputs. Compare the original plan and candidates, check which orders move, and decide which version to adopt.

  1. 01

    Generate candidates

    Calculate from confirmed inputs and flag risks

    Schedule example / Order set 0520Order A17 moves up, partner time kept clear
    Delivery priority
    Line AWelding
    Line BMachining
    Line CAssembly
    Partner DSurface finishing
    Order D12 may miss its due date if the partner return slipsReview
  2. 02

    Planner review

    Compare priorities and check shop-floor conditions

    Planner workspaceAdjust strategy and review key constraints
    • Order due dates and customer priority
    • Real capacity on critical machines
    • Confirmed material and outsourcing times
  3. 03

    Approve and hand over

    Record approval and export the plan for handover

    Schedule resultChoose a strategy to view the schedule
    Work orderResourceStatus
    Order A17Line APending review
    Order C08Line BPending review
    Order D12Partner DRisk to review

    When a rush order, shortage, or machine fault comes up, a new plan is built once it is confirmed

Kavop
Planning layer

Data preparation, rules, scheduling, option comparison, and risk explanation

Existing data (read-only)

Use company-provided ERP exports, spreadsheets, current schedules, and operating rules. The first round stays read-only. Planners review and approve the schedule before exporting it for handover.

  • ERP exportsOrders, materials, BOMs, routings, inventory, and purchasing records
  • ExcelOrder lists, capacity data, parameters, and custom rules
  • SQL query resultsQuery results your company authorizes
Coverage

Plan around your own processes and capacity.

Each manufacturing process brings different constraints. Use your own orders and routings to validate the rules and scheduling results included in the first round.

See how high-mix, low-volume plants use it
  1. Line drawing of a discrete manufacturing cell with CNC equipment, robotics, and conveyors
    01

    Discrete manufacturing

    High mix, low volume

    Many products, many operations, shared machines. Every operation sequenced against due dates and changeovers.

  2. Line drawing of a process manufacturing installation with tanks, columns, pumps, and pipework
    02

    Process manufacturing

    Batches and recipes

    Schedule by batch, recipe, and continuous capacity, with material across linked steps calculated together.

  3. Line drawing of a complex wind-turbine assembly area with nacelle, rotor, and workstations
    03

    Complex assembly

    Multi-level BOMs

    Schedule assembly against multi-level BOMs and critical-part arrivals, with long-lead items visible early.

See the risk first,then decide how to schedule.

Start with real orders, routings, and capacity rules. Book a demo or contact contact@kavop.com

Book a demo