AI APSfor manufacturers.
Production plans built for finite capacity. Schedule orders against routing, machines, shifts, and materials, with planners reviewing and confirming each plan.
Book a demo
Order review
Capacity scheduling
Shipment coordination
Order reviewDue-date commitment
Capacity schedulingFinite-capacity scheduling
Shipment coordinationShipping cadenceWhen demand exceeds capacity,work through the plan first
Use the same order, capacity, and material inputs to review due dates, resource load, and readiness. Planners decide the production sequence. Diagram data is illustrative.
Explore APS scheduling- 01
Order demand
Bring together this run’s orders, quantities, and due dates as scheduling inputs.
- 02
Due-date review
Compare requested dates with projected completion and identify dates to coordinate.
- 03
Capacity load
Review resource calendars and available hours to identify bottlenecks.
- 04
Production scheduling
Generate a plan from routings, resource constraints, and priorities for planner review.
Compare the delivery impact before changing the plan.
When a rush order arrives or production conditions change, recalculate with the updated inputs. Compare the original plan and candidates, check which orders move, and decide which version to adopt.
Every plan version records the data it used and who approved itOrders and changes
Orders and versions
Scheduling rules
AI re-plan
A plan built on real capacity
Several options to compare
Shop-floor completion
Released through the plant's existing process
Checked progress feeds the next round

Next round
Checked progress and exceptions
Rechecked when the data updates
Orders and changes

- Rush orders
- Machine status
AI re-plan
- Due dates
- Capacity
- Materials
Recalculated from the latest data
Shop-floor completion

Completions checked on the floor
Next round
Checked progress and exceptions
Turn order priorities into a production plan.
Compare candidates within capacity and material constraints. See how each option affects due dates and resource load, then let planners decide the sequence and which delivery dates need coordination.
Due-date priority plan
Orders due soonest go first. One material risk and one outsourcing risk are flagged.
Swipe sideways to see the full schedule and due-date status →
- Line A, Welding. Order A from 5/20 to 5/21; A-02 from 5/22 to 5/22; Pending from 5/26 to 5/27. Load range 10 to 62. No other risk markers. Due-date status Order A, Ahead of date.
- Line B, Machining. Order C from 5/21 to 5/23; C-02 from 5/24 to 5/25; Changeover from 5/27 to 5/28. Load range 8 to 72. Risk markers Line B, May 25, critical material may arrive late. Due-date status Order C, On time.
- Line C, Assembly. Material prep from 5/20 to 5/21; Order B from 5/23 to 5/25; B-02 from 5/26 to 5/28. Load range 8 to 70. No other risk markers. Due-date status Order B, On time.
- Partner D, Surface finishing. Outsource from 5/21 to 5/22; Order D from 5/25 to 5/27. Load range 6 to 64. Risk markers Partner D, May 27, delivery risk. Due-date status Order D, Partner risk.
Compare the delivery impact before changing the plan.
When a rush order arrives or production conditions change, recalculate with the updated inputs. Compare the original plan and candidates, check which orders move, and decide which version to adopt.
- 01
Generate candidates
Calculate from confirmed inputs and flag risks
Schedule example / Order set 0520Order A17 moves up, partner time kept clearDelivery priorityLine AWeldingLine BMachiningLine CAssemblyPartner DSurface finishingOrder D12 may miss its due date if the partner return slipsReview - 02
Planner review
Compare priorities and check shop-floor conditions
Planner workspaceAdjust strategy and review key constraints- Order due dates and customer priority
- Real capacity on critical machines
- Confirmed material and outsourcing times
- 03
Approve and hand over
Record approval and export the plan for handover
Schedule resultChoose a strategy to view the scheduleWork orderResourceStatusOrder A17Line APending reviewOrder C08Line BPending reviewOrder D12Partner DRisk to reviewWhen a rush order, shortage, or machine fault comes up, a new plan is built once it is confirmed
Data preparation, rules, scheduling, option comparison, and risk explanation
Use company-provided ERP exports, spreadsheets, current schedules, and operating rules. The first round stays read-only. Planners review and approve the schedule before exporting it for handover.
- ERP exportsOrders, materials, BOMs, routings, inventory, and purchasing records
- ExcelOrder lists, capacity data, parameters, and custom rules
- SQL query resultsQuery results your company authorizes
Plan around your own processes and capacity.
Each manufacturing process brings different constraints. Use your own orders and routings to validate the rules and scheduling results included in the first round.
See how high-mix, low-volume plants use it
01Discrete manufacturing
High mix, low volume
Many products, many operations, shared machines. Every operation sequenced against due dates and changeovers.
02Process manufacturing
Batches and recipes
Schedule by batch, recipe, and continuous capacity, with material across linked steps calculated together.
03Complex assembly
Multi-level BOMs
Schedule assembly against multi-level BOMs and critical-part arrivals, with long-lead items visible early.
See the risk first,then decide how to schedule.
Start with real orders, routings, and capacity rules. Book a demo or contact contact@kavop.com
Book a demo