When demand exceeds capacity, priorities need a plan
APS stands for Advanced Planning and Scheduling. Finite-capacity scheduling assigns operations within the working time available on each resource, while respecting the routings, materials, and due-date constraints represented in the plan.
When orders compete for a bottleneck resource, prioritizing one can delay another. Kavop generates candidates and explains risks within the current scope. Planners check unmodelled shop-floor conditions before approval. A genuine capacity shortfall still requires delivery or resource decisions.
Start with the data the plant already has
The first round stays read-only. The data does not need to be perfect on day one. Start with what actually changes the schedule.
- Order numbers, quantities, due dates, and priorities
- Routings, operation sequence, and standard times
- Machines, lines, tooling, labor, and shifts
- Inventory, inbound supply, and critical-part arrivals
- Changeovers, downtime, rush orders, and shop-floor rules
The result should answer the planner's daily questions
A nicer Gantt chart does not replace shop-floor judgment. The result has to say which orders will be late, why, where the bottleneck is, which orders a rush job pushes back, and which options are worth comparing.
- Operation and resource plans based on finite capacity
- Order due-date risk and the reason behind each late order
- Critical machine, operation, and material risks
- Impact after a rush order, downtime, or due-date change
- Plans compared under your priority and changeover rules
Walking through one order review
Three example orders show how a review runs. The order numbers and conditions are examples.
The review fixes a data cutoff, keeps the current schedule as the baseline, then brings in the confirmed orders, resources, and material status.
- In the baseline, A17 and B04 need the same critical machine. A17 is close to its due date, and one changeover condition for C08 is still unconfirmed.
- The proposed plan moves A17 into an earlier open slot. The planner then checks whether that affects B04.
- C08's changeover condition has not been entered yet, so the planner marks it as pending and reruns once the data is in.
- The planner can adopt, adjust, or send back the plan and record why. Every version is kept.
The planner makes the final call
The system proposes a plan and flags risks. Planners can change order priority, key constraints, and scheduling strategy, then approve and export. Every change keeps a version and a reason, so the team can see later why the plan moved.
Many plants start with shadow scheduling. Real orders run through the current method and the new plan side by side, while the existing production decision process carries on.
Which manufacturers should evaluate APS
When order demand keeps pressing against bottleneck capacity and existing systems cannot easily compare plans, use a real order set to evaluate APS. High-mix production, batch processes, and complex assembly each require validation of their own routing, capacity, and material rules.
- ERP or MES is in place, but scheduling still runs on spreadsheets
- Due dates, changeovers, machines, materials, and rush orders keep colliding
- Scheduling know-how sits with a few people and plans are hard to review
- Due dates are hard to call at order intake, so promises turn into firefighting
Common questions
- Does APS replace an ERP or MES
- No. ERP handles commercial and resource data, and MES handles execution and shop-floor reporting. Kavop sits in the planning layer, reads existing data, and produces schedules you can review.
- Can we start with incomplete data
- Yes. Start with the data that changes the result, usually orders, routings, resources, due dates, and the main shop-floor rules, and fill in the rest as you go.
- Will the first version write back to production systems
- No. The first round stays read-only. Results are exported for the planning team to check, then released through the plant's existing process.
- How soon can we review a first plan
- With the data in place, the target is a first reviewable plan in seven to ten business days. That is a target, not an unconditional SLA. Actual timing depends on data scope, routing complexity, and how fast the rules get confirmed.