Who this planning role includes
Titles vary. Some plants call it PMC, some split production planning, material control, and order follow-up, and in others the plant manager or operations lead signs off. Whatever the name, someone has to see the order risk before a schedule is released.
Planners consolidate demand, check constraints, compare options, and drive handoffs to sales, purchasing, and the shop floor. Who can commit a date to a customer, release a work order, or change an execution system follows the company's own approval rules.
Bring six daily questions into one view
Which orders will be late today, at which operation, which resource is the bottleneck, which critical materials have not arrived, who a rush order or downtime will push back, and whether this plan is ready to move on. Each answer has to land on a specific order and plan version.
A utilization figure or a summary spreadsheet is not enough. High utilization can come with more work in process, more changeovers, and more late orders, and having the material does not mean machines, operations, and shifts can fit the work. Planners need to see which constraints sit behind each call.
- Late orders and expected completion dates
- Where and why each late order slips
- Available capacity on key resources by period
- Critical material stock, expected receipts, and need dates
- Existing orders hit by rush orders, downtime, or due-date changes
- Current version status, change reasons, and approver
Fix the data cutoff and define every date
If the orders are from this morning, the material file stopped yesterday, and the resource calendar does not show tonight's downtime, the result will not reconcile. Every round needs one data cutoff and a record of which version of orders, routings, resources, shifts, materials, and the current schedule it used.
Keep the requested date, expected completion, planned ship date, the date committed to the customer, and the expected material arrival separate. A date production can hit becomes a customer commitment only after review.
Trace the late-order list to order-level causes
Start with late and nearly due orders, then follow the operations through resource load, calendars, changeovers, downtime, and materials. Even when capacity fits and material is in, check the date milestones and shop-floor exceptions.
Compare plans on the same order set and the same data cutoff. Beyond earlier or later, list what changed in resources, sequence, materials, and frozen scope, and keep unchanged orders in the comparison so the team knows what was covered.
Turn each change into affected orders and handoffs
When a rush order, downtime, shortage, or due-date change lands, planning first lists the affected orders, then brings comparable options to the teams involved. Sales needs to know which customer dates need another review, purchasing needs the critical gaps, and the shop floor confirms the resources and rules can take it.
Every handoff carries the data cutoff, plan version, changed orders, causes, open items, and owners. A verbal "this is urgent" should not quietly become the top system priority, and a shop-floor workaround should come back into a recorded version.
Keep plan approval separate from release
A proposed schedule, an approved plan, the work orders created when the ERP firms or releases them, and shop-floor execution are four different stages. Terms and configuration vary by system, so the company needs to be clear on who can adjust, who approves, what can be released, and which actions write into ERP or MES.
Kavop leaves the final approval with the planner or another authorized person. The system compares plans and records every change. People commit dates to customers, and work orders go out through the plant's existing process.
Start with one order set and a plan you can review
The first round stays read-only and can cover one de-identified order set, one workshop, or one planning cycle. Keep the current schedule as the baseline, build a new plan from the same cutoff, and go through late orders, bottlenecks, shortages, change scope, and missing shop-floor rules order by order.
This round checks four things: whether the data reconciles, whether the constraints are captured, whether the risks can be explained, and whether planners can review the result. Once it works, extend it to more workshops and planning cycles.
The system makes risk visible, the company decides
Kavop reads ERP exports, spreadsheets, SQL data, current schedules, and shop-floor rules, builds comparable plans, and explains late orders, bottlenecks, and rush-order impact. Plans and changes are versioned, and results can be exported.
Kavop sits in the planning layer and does not replace ERP or MES. The planning team reviews the result and decides what comes next. Release or write-back into other systems is set up once the company has agreed the scope and controls.